Total
Quality Management
The
company’s main policy is to supply products
and render services of the best quality. To achieve
these objectives it has undertaken a Total Quality
Management Program.
Aim
To achieve and maintain a level of Zero Defects
in our services.
Method
The stages involved in TQM are to lay
down a Standard Specification Plan, Implement
and audit the system of each stage, such as procure,
inspect, repair, rewind, overhaul, install, test
and maintain.
Quality Assurance Plan
The
first step in evolving a QA plan is to study the
clients’ standards and specifications, and
related, National and International Standards
Specifications. Lay down specific stages, i.e.
frequency, method, equipment, test agency and
acceptable standards. These are to be implemented
at every stage of procurement, inspection, repairing,
rewinding, overhauling, installation, testing,
and maintenance.
Formats
will be evolved to document the actually achieved
parameters as against acceptable standards. Unless
testing methods and equipments are specified in
National International Standards, such procedures
will be evolved in consultation with the client
and documenter.
Quality Control Program
After
discussing the company QA plan with the client,
the frequency, of inspection, testing, witnessing,
of test by clients Representative / Surveyor,
inspection request formats, documentation format,
acceptance format, agencies, to carry out various
functions etc, will be finalized.
After the QC program has been finalized the frequency
of audit and agency of audit will be laid down.
At the end of each project a QA/QC document will
be produced to include all the relative individual
documentation.
Delegation of Responsibility
Manager
QA/QC will have the access to report directly
to the Managing Director. QA/QC Manager will lay
down responsibilities to his subordinates in each
specific case.